Measure D modernized the front of the school, as well as the exterior of the campus, with a new bus loop, modernized office area, and security fencing. The focus to start Measure C is the TK/K classrooms. We will add a new kindergarten portable to match the two that were put in during Measure D. Once in, we will be modernizing the current Kindergarten classroom building. All interiors and exteriors will be modernized and new HVAC (heating, ventilation and air conditioning) will be added.
We are also adding more student restrooms to that building to accommodate recess and lunch periods. The childcare portables on the north side of campus will also be replaced with new buildings. The main restrooms on campus will also be modernized during Phase 1.
- One above grade portable TK classroom with fire alarm and restrooms.
- Sitework for new TK portable.
- Modernization of interiors of existing Kindergarten classroom building to include: new wall, floor and ceiling finishes; remove casework; new sinks with casework; restroom ADA and finish upgrades; replace HVAC and add cooling at each classroom;new lighting; and replace windows with new blinds.
- Modernize and upgrade four main student multi-accommodation restrooms for ADA and finishes.
- New above grade childcare portables to replace existing, includes one 960 square foot preschool classroom with restroom and one double 1920 square foot childcare classroom.
- Remove existing portable and sitework for new portables.
- Interim housing of two portables from MBHS.